Market:
  • Office
Services:
  • Civil Engineering

Sands Decker provided detailed site civil engineering for the new 40,000 square foot Basic Systems (BSI) office building, entry drive, parking lot, and water and sewer facilities. Design documents included a site dimension plan; site utility plan including water services, sanitary sewer services, stormwater drainage and stormwater detention in compliance with OEPA Phase II post-construction requirements; and a site grading plan. The documents also included a Storm Water Pollution Prevention Plan (SWP3) in compliance with state and local regulations for sediment and erosion control during construction.